Route 9 Corridor Study

The study for Missouri Highway Route 9 in Parkville, MO and Riverside, MO provided specific design details to turn the urban two-lane… read more »

Watson Drive Extension & 19th Street Improvements

This project consisted of the design of approximately 4,250 feet of Watson Drive (new construction) from the Shoppes at Kearney to 19th… read more »

Flint Hills Nature Trail

The Kansas Department of Wildlife, Parks and Tourism (KDWPT) and Kanza Rails to Trails Conservancy (KRTC) selected CFS to lead the planning,… read more »

Bike Hays Improvements

The Bike Hays Plan and Improvements began as a way to adapt bicycle facilities to the needs of the residents of Hays.… read more »

Spirit of 76 Complete Street

Through 2014, the CFS Team led the completion of the Spirit of 76 Master Plan, a guiding document for the long-range improvements.… read more »

Wyatt Earp Boulevard

This project involved construction of a five-lane roadway section with sidewalks on both sides by replacing an existing four-lane roadway while maintaining… read more »

Thomas Street Bridge

CFS Engineers was selected by Platte County to provide construction administration and oversight for the construction of a new bridge over Brills… read more »

Stadium Boulevard

CFS was the design engineer for the Stadium Boulevard Improvement Project in Columbia, Missouri. This unique and innovative partnership brought together three… read more »

North Cass Parkway

Construction of a new diamond interchange at US-71 and North Cass Pkwy included relocating frontage roads, one mile of new roadway, and… read more »

MKT Trail Bridge No.6 , No.12, and No.13

Bridge No. 6 project consisted of replacing and existing bridge with a new structure. The new structure was a 70’-0” prefabricated truss… read more »