Watson Drive Extension & 19th Street Improvements

This project consisted of the design of approximately 4,250 feet of Watson Drive (new construction) from the Shoppes at Kearney to 19th… read more »

Flint Hills Nature Trail

The Kansas Department of Wildlife, Parks and Tourism (KDWPT) and Kanza Rails to Trails Conservancy (KRTC) selected CFS to lead the planning,… read more »

Bike Hays Improvements

The Bike Hays Plan and Improvements began as a way to adapt bicycle facilities to the needs of the residents of Hays.… read more »

Edwardsville Trail

The Edwardsville Trail project included the construction of a 6,300 linear feet of a 10’ wide multi-use path along the Kansas River… read more »

Stokes Road Bridge

The new Stokes Road Bridge replaces an existing low  water crossing at Little DryWood Creek located southwest of Nevada.  The existing crossing… read more »

Shawnee Plaza

Shawnee Plaza Shopping Center in Shawnee, Kansas was a nearly vacant, blighted strip   center suffering from a bad economy and lack of… read more »

Spirit of 76 Complete Street

Through 2014, the CFS Team led the completion of the Spirit of 76 Master Plan, a guiding document for the long-range improvements.… read more »

Belle Avenue Stormwater Retention Pond

The purpose of this project was to develop a stormwater management pond to improve water quality, attenuate downstream channel flows and create… read more »

US 400 Bypass

This system enhancement project consisted of the construction of a bypass around the southwest side of Dodge City. The project connects US… read more »

Stadium Boulevard

CFS was the design engineer for the Stadium Boulevard Improvement Project in Columbia, Missouri. This unique and innovative partnership brought together three… read more »