Edwardsville Trail

The Edwardsville Trail project included the construction of a 6,300 linear feet of a 10’ wide multi-use path along the Kansas River… read more »

MKT Trail Bridge No.6 , No.12, and No.13

Bridge No. 6 project consisted of replacing and existing bridge with a new structure. The new structure was a 70’-0” prefabricated truss… read more »

Lake Shawnee Trail

This trail involved a master plan and engineering design. The master plan focused on the development of a multipurpose trail that connected… read more »

Drake Harbor Trail

CFS worked with the City Administrator to develop a paved river walk extension to the Drake Harbor recreation and festival area that… read more »